The maximum continuous power available from a hydroelectric plant under the most adverse hydraulic conditions is known as ________.

A.

base power   

B.

firm power 

C.

primary power 

D.

secondary power 

Answer ( Option B)

firm power 

Solution

The maximum continuous power available from a hydroelectric plant under the most adverse hydraulic condition is known as firm power.

Hence, the correct option is (B).