LOADING
Question
A bridge has an expected life of 25 years and is designed for a flood magnitude of return period 100 years. What is the risk of this hydrologic design?
(a) (b)
A.
B.
C.
D.
Answer ( Option C)

Solution

Design life (n) = 25 yr Return period (T) = 100 yr

Online Classes

We care about our students



Online Classes
Register Now
Test Series
Register Now
Job Notification
Job Notification

Daily Quiz

RPSC-AE, RSMSSB-JE, SSC-JE, RRB-JE, PSU's