Question
In analysis of rate the quantity of dry cement mortar for 10 cubic meter brickwork is taken as
A.
0.3 m3
B.
1.0 m3
C.
3.0 m3
D.
5.0 m3
Answer ( Option C)

3.0 m3

Solution

Number of bricks for 10m3 of brickwork = 500 × 10 = 5000
Volume of 1 brick (in cm3) = 19 cm × 9 cm × 9 cm = 1539 cm3
Volume of 5000 bricks (in m3) = 5000 × 1539 × 10-6 = 7.695 m3
So, volume of actual mortar = 10 – 7.695 = 2.305 m3
Increase wet volume by 30% to take effect of bulking, shrinkage in account
Hence, Dry volume of mortar = 1.3 × 2.305 = 3 m3