LOADING
Question
Match List-I (Component of scaffolding) with List-II (Function) and select the correct answer

List-I

List-II

A.  Putlog

1.   Diagonal member

B.   Ledger

2.   Vertical member

C.   Brace

3.   Horizontal member

D.  Standard

4.   Transverse member

Codes:
    A   B   C   D
A.
4    3    1    2
B.
4    3    2    1
C.
3    4    1    2
D.
3    4    2    1
Answer ( Option A)

4    3    1    2

Solution

Standards are the vertical members of scaffolding.
Ledgers are the horizontal members at right angle to the standard and parallel to the wall.
Braces are fixed diagonally on the standards.
Putlogs are placed on the horizontal member (i.e. ledgers) at right angle to the walls, one end of which is held in wall.

Online Classes

We care about our students



Online Classes
Register Now
Test Series
Register Now
Job Notification
Job Notification

Daily Quiz

RPSC-AE, RSMSSB-JE, SSC-JE, RRB-JE, PSU's