Select the wrong statement from the following in relation to power flow
analysis
Bus is required for
power flow analysis
Approximation is used in FDLF method
Jacobian is always required
Number of iteration in N-R method can not be more than 30 for any
system
Jacobian is always required
In power flow analysis :
1. Bus is required for
power flow analysis
2. Approximation
is used in FDLF method
3. Number of itteration in N-R method can not be more than 30 for
any system
Jacobian is not always
required in power flow analysis.
Hence, the correct
option is (C).