The rise of water level on the upstream of the structure after the construction of the weir/ barrage is called as- 
ohj@cSjkt ds fuekZ.k ds ckn lajpuk ds viLVªhe ij ikuh ds Lrj dk mn; dks dgk tkrk gSA
A.
Pond level
B.
Afflux
C.
Flood level
D.
None of these
Answer ( Option B)

Afflux