When an overhead connection is to be a single story building using G.I.
pipe is required to be supported by
Cross-arm
Clamps
Stay
wire
Bird guards
Stay
wire
When
an overhead connection is given G.I, pipe. It is required to be supported by
stay wire.
Hence,
the correct option is (C).
Preparing students for success in a changing World.
We care about our students
RPSC-AE, RSMSSB-JE, SSC-JE, RRB-JE, PSU's