LOADING
Question

Which of the following has to be considered for overhead/underground electrical power transmission/distribution system?

A.

The voltage at the consumer’s premises must be maintained within  or  of the declared voltage.

B.

The transmission cost should be unduly excessive.

C.

The insulation resistance of the whole system should be very high.

D.

The loss of power in the system itself should be a small percentage (about 10%) of the power transmitted.

Answer ( Option A)

The voltage at the consumer’s premises must be maintained within  or  of the declared voltage.

Solution

The point to be considered for overhead/underground electrical power transmission distribution system is :

1. The voltage at the consumer’s premises must be maintained within   or   of the declared voltage.

2. The insulation resistance of the whole system should be very high.

3. The loss of power in the system, itself should be a small percentage (about 10%) of the power transmitted.

Hence, the correct option is (A).

Online Classes

We care about our students



Online Classes
Register Now
Test Series
Register Now
Job Notification
Job Notification

Daily Quiz

RPSC-AE, RSMSSB-JE, SSC-JE, RRB-JE, PSU's